Sunday, March 26, 2023

 26 March 2023


We have been doing mostly finish type work since my last post.   Progress is VERY slow.   All the walls are painted, except for the entry room.  The propane fireplace is roughed in -  waiting on the vent pipe and termination cap.  The finished floor is down in both of the bedrooms - 2nd and 4th floors.   The master bedroom is mostly complete.   The walls have been painted with 8' tall trees and the shelf on the headboard area of the bed now has an inlay  - representing the flinthills and  sunrays.  The interior shutters are built and ready to be installed (waiting on hinges).  The tankless water has found its' home under the stairway on the second floor.  We finally have a functioning toilet in the silo.(we have to carry water in a bucket to make it flush).   The dense  foam, sloped floor of the shower has been installed.



















No comments:

Post a Comment

 We are nearing completion.   Open House is scheduled for Sunday, July 23, 2-5 Finish work has been slow and tedious.    The outside patio a...