Sunday, June 11, 2023

 6-12-2023

It has been 6 weeks since my last post.  We have constructed a sheltered/patio area.   Progress continues on this phase.   We have installed a swing and incorporated a eastern red cedar tree with character into the design of the patio.  Plumbing -  installed the water components - pressure tank, whole house filter, descaler and UV sterilization light.   The tankless water heater is now fully functional.  Bathroom sinks are installed and functional.   The 1/2 bath sink is in -but not heat hooked up.   We had to penetrate the concrete silo wall for inlet and exit pipes.   The propane lines have been connected.   Kitchen cabinets are nearing completion - tin punch for upper cabinets/   countertop has been cut -waiting for sink and faucet installation.    Bunkbeds for the second floor will be assembled and installed in the coming week.  King bed in master bedroom is ready for mattress.  Curved eating bench at base of stairway. Cedar shakes on gable on entrance.














 We are nearing completion.   Open House is scheduled for Sunday, July 23, 2-5 Finish work has been slow and tedious.    The outside patio a...