4/29/2023
Progress continues slowly. All the flooring is down; tile is down on the shower floor, as is the metal for the shower walls. A special hand painted window separates the shower and the main bath area. The fireplace is installed, along with the stone, mantel and barnwood. Lots of staining and polyurethane on wood trim and doors. Starting into the 3rd gallon of stain and second gallon of polyurethane. Kitchen cabinet construction has begun.
No comments:
Post a Comment