Friday, August 5, 2022

 8-5-2022


made it to the top today by noon!   3 custom spiral staircases - a total of 42 steps!   Heat index was headed to 105 this afternoon.    We decided to call it a day at noon.   Jack and Carter - my two grandsons are done for the summer!   We made lots of progress since 6-1.   4 or 5 rain days in June and sweltering  heat in July!   We got all of the main sewage system installed under the 1st floor; all floor joists and subfloor installed on 4 floors; all of the perimeter walls installed; all of the interior walls framed; built an octagon roof on the ground and had a crane lift it up to the top of the silo; electrical wire completed on 3 floors, and 3 circular stair cases completed.   We still need to add risers, and extra support to the stairs, but the main structure is walkable!   All of the lumber piles that we started the summer with have dwindled to just a few boards.










No comments:

Post a Comment

 We are nearing completion.   Open House is scheduled for Sunday, July 23, 2-5 Finish work has been slow and tedious.    The outside patio a...