Friday, July 15, 2022

7-15-2022

Progress has been quite slow the last couple of days.   Afternoon heat is forcing us out of the silo.   We are building wall sections for the 4th floor and doing prep work for the roof.   A breakdown on the mower and cleaning the rainwater collection tank, caused further delays.. We have made the final push to get the 4th (final) floor.    Floor joists , subfloor and most of the wall sections are in.   Having to push everything up through the stairway opens is a slow and  tough job.   4 people - one on each floor.  Painting of the inside walls of the silo are done.  check out the view from the top window of the 4th floor.